Southern California electrical • solar • energy serviceCall 323-928-8880

Real Eco Solar & Electric job video proof

One property. Two ADUs. Two separately planned solar systems.

Two ADUs on one Los Angeles property did not mean one copy-and-paste solar layout. One array belongs on a second-story roof; the other is built on a first-story roof. Each system needed its own approved layout, attachment plan, conductor path, electrical coordination and safe installation sequence. Part One follows the rooftop work from layout and rails through module staging and installation. Part Two carries the story to the wall-mounted equipment, protected conductors, grounding and bonding, disconnects and electrical integration.

How we can help

Common reasons customers call

  • Two ADUs with two separately planned rooftop solar systems
  • First-story and second-story roof conditions
  • Roof measurements, attachments and approved array layouts
  • Rail preparation, cable management and module installation
  • Solar equipment, inverter and disconnect integration
  • Protected conductor pathways
  • Grounding and bonding work
  • Installation documented for inspection, utility authorization and commissioning

Clear process

What happens next

  1. 01Review the approved plans, equipment and each ADU roof
  2. 02Lay out attachments around roof and setback requirements
  3. 03Install the mounting systems and secure the modules
  4. 04Route and protect each system’s conductors
  5. 05Install and connect the approved wall-mounted equipment
  6. 06Complete inspection, utility and commissioning requirements before final production claims

Real job video proof

See the condition and our diagnostic approach.

Real Southern California field work connected to the problem, location and service—not vague promises.

Los Angeles, California • Real job video

Two ADU Solar Systems: Electrical Integration | Los Angeles Part 2

Part Two continues the Los Angeles two-ADU solar installation from the rooftop arrays to the electrical integration. This field video documents wall-mounted solar equipment, inverter and disconnect work, grounding and bonding conductors, protected wiring pathways and the deliberate closeout of two separately planned solar systems on one property. Final inspection, utility authorization and production verification remain part of the approved project closeout.

Field experience

Two videos. One coordinated two-ADU solar project.

Part One documents the different roof conditions, mounting and module installation. Part Two shows the electrical side taking shape at the wall equipment and disconnects. Together they show why multi-structure solar demands disciplined planning from the rooftop arrays through the electrical integration. Final system size, interconnection and production remain governed by the approved plans, utility requirements, equipment and completed project closeout.

Explore the proof library →

Ready when the problem isn’t.

Need service in this area?

Call, text a photo or send a short description. We’ll help identify the right next step.

Tap to Call Eco Solar & Electric323-928-8880