One Property, Two ADUs, Two Solar Systems | Los Angeles Part 1
One Los Angeles property, two ADUs and two separately planned rooftop solar systems. Part One documents the field work behind the headline: roof layout, attachment and rail preparation, electrical pathways, module staging and the first installed array. The first- and second-story roofs required their own safe access, layout and installation sequence. Final system sizing, interconnection and production depend on the approved plans, equipment and utility requirements.
Powered by Mr. Cheto ElectricText for service